Advertisement
  • National News
  • State News
  • Contact Us
  • Login
  • My Account
Subscribe for $3.50/month
Print eDitions
Parsons Advocate
  • News
    • Top Stories
    • Local Stories
    • Sports
    • School
    • Cutlines
  • Obituaries
  • Opinions
    • Turner’s Tidbits
    • Clint’s Column
    • Common Threads
    • Letters to the Editor
    • Momma Said
    • Mostly True Stories
  • Tucker County Senior Center News
  • For The Record
    • Magistrate News
    • Marriages
    • Property Transfers
    • Police News
  • Bulletin Board
  • What’s Happening
    • Reunions
  • eAdvocate
  • Legals
  • Login
No Result
View All Result
Parsons Advocate
No Result
View All Result
Parsons Advocate
No Result
View All Result

Go North Alliance: Corridor H Opening Time to Question Remaining Route

Mountain Media, LLC by Mountain Media, LLC
June 30, 2026
in Opinions
0

By: Barbara Weaner

The Go North Alliance

On June 22, the Governor joined federal, state, and local officials, highway workers, contractors, consultants, and citizens including a sign-carrying Go North delegation, to open a section of Corridor H between Kerens in Randolph County and Rt. 72 north of Parsons in Tucker County. Eleven years of construction had extended the highway eleven miles.

From the west, 43 miles of the four-lane are now open from I-79 at Weston to Parsons. Construction is ongoing on 3.5 miles from Rt. 72 across the Cheat River bridge to US 219 at Mackeyville. From the east, 66 miles are open from Wardensville to Davis. As ever, Parsons to Davis is the missing piece in the middle. (A shorter outlier from Wardensville to the Virginia border is scheduled for completion before Parsons to Davis begins.)

Other reasons besides its difficulty can help explain why the 10-mile stretch from Parsons to Davis was saved for last. For one, ease of access for visitors from the east to Tucker County’s four-season attractions offered a more likely payoff than any other “economic development.” Thus, once the corridor reached Elkins, the focus jumped to that side. Now it has returned.

Nevertheless, it is true that the Tucker County connection has been regarded as the

most problematic of the entire corridor. Looking at the just-opened section as a rehearsal for that project, we are worried. Numerous issues plagued and lengthened its years of construction. Most visible has been the bridge over 219 at Moore. The site had to be completely reconstructed after discovery that its piers had slipped. As far as we know, the state and the contractor are still litigating each party’s responsibility. We hope there are no further consequences.

For insights into the problems that travelers don’t see, we asked Barbara Weaner, who with her husband Scott has lived on a farm on South Haddix Run for fifty years. Here’s Barbara’s report:

The watershed upstream of us is entirely in the Monongahela National Forest. South Haddix was a breeding native brook trout stream prior to the highway construction. Massive clearcuts and obliteration of many ephemeral streams caused dramatic changes in sedimentation, which not only killed the trout but increased flooding.

The worst flooding in the last 50 years occurred on South Haddix Run on May 26, 2024, shortly after the highway was paved. Water ran off the surface and shot out of the new culverts down steep hollows degraded by construction fill, discarded timber and rubble. Huge volumes of water barreled through our hollow, carrying large trees onto our pastures. Our farm fences were torn down. The stream broke out of its banks, across our fields, into our pond, which then broke out of its banks, flooding the roadway across the hollow. Not even during the flood of 1985 did we see anything like it.

Since then, high water events have continued. The most recent was on May 27, when more than 3 feet of water covered 219 at the newly paved exit ramp at Moore. 219 was closed for many hours. Heavy rain overwhelmed poorly designed drainage ditches and inadequate culverts.

That new intersection is confusing and dangerous in other ways. The ramp exits into a tight curve on an abrupt hump. It’s a blind spot coming from either direction on 219. It’s probably lucky the flood happened during daylight — if it had been dark, fatalities would have been likely.

We have maintained good relationships with the highway department, the Department of Environmental Protection and the West Virginia Rivers Coalition, reporting problems with stream turbidity and flooding. During the last five years, there have been dozens of violations and fines.

But the Governor and other officials celebrated the grand opening of the Kerens to Parsons section while these problems remained uncorrected.

The next section of the road from Mackeyville to Davis will cover steeper terrain. Many more trout streams will be threatened. Will our state’s highway department, the Federal Highway Administration and the DEP learn from the mistakes made on earlier sections? Will citizens get trained in stream monitoring and participate in the Rivers Coalition’s Citizens Scientist program? Will citizens be willing to report flooding, stream sedimentation and erosion along the construction path? Will less destructive practices and a better route be instituted?

Join Our Newsletter

Enter your email address to receive weekly updates straight to your inbox.

Please check your email inbox and spam folder to confirm your subscription.
Some fields are missing or incorrect!
Lists
Previous Post

From Davis to The Farm: Tucker County's Own Earns Stanford Degree

Next Post

Opinions

Next Post
eAdvocate – July 1, 2026

eAdvocate – July 1, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT
  • News
  • Obituaries
  • Opinions
  • Tucker County Senior Center News
  • For The Record
  • Bulletin Board
  • What’s Happening
  • eAdvocate
  • Legals
  • Login

© 2025

  • Login
Forgot Password?
Lost your password? Please enter your username or email address. You will receive a link to create a new password via email.
body::-webkit-scrollbar { width: 7px; } body::-webkit-scrollbar-track { border-radius: 10px; background: #f0f0f0; } body::-webkit-scrollbar-thumb { border-radius: 50px; background: #dfdbdb }
No Result
View All Result
  • News
    • School
    • Sports
    • For The Record
      • Magistrate News
      • Property Transfers
    • Bulletin Board
      • What’s Happening
      • Tucker County Senior Center News
  • Obituaries
  • Opinions
    • Momma Said
    • Mostly True Stories
    • Turner’s Tidbits
    • Clint’s Column
    • Letters to the Editor
  • eAdvocate
  • Spiritual
    • Transcendental Meditation
    • Diocese of Wheeling-Charleston
    • Parabola
    • Southern Baptist
  • Classifieds
  • Contact Us
  • My Account
  • Login
  • FAQ

© 2025